What Should Strata Managers Consider Before Replacing an Apartment Building Lift?
Replacing an apartment building lift is a major project that requires careful planning, budgeting, and communication with residents. Strata managers must consider the condition of the existing elevator, the building’s access requirements, project costs, installation timelines, and the impact of lift downtime on residents.
Unlike a lift replacement in a standalone commercial property, an apartment building project affects people who rely on the elevator every day. Older residents, people with mobility limitations, families with young children, and residents moving heavy items may need alternative access arrangements while the work is underway.
A structured plan helps strata managers understand the project requirements and prepare residents for the disruption.
1. Assess the Condition of the Existing Lift
Before arranging an apartment building lift replacement, strata managers should understand why the existing elevator needs attention.
Frequent breakdowns, ageing components, obsolete parts, and increasing maintenance requirements can indicate that the lift is becoming difficult to maintain. However, these problems do not automatically mean full replacement is necessary.
Start by reviewing:
- The elevator’s maintenance and breakdown history.
- The condition of major mechanical and electrical components.
- The availability of replacement parts.
- Recurring faults and repair costs.
- Inspection findings and unresolved defects.
- The lift’s performance during periods of high demand.
A qualified lift contractor can assess whether targeted repairs or modernisation may address the problems or whether replacing the complete system is more practical.
2. Compare Lift Modernisation With Full Replacement
Strata managers should not assume that an ageing elevator always needs to be replaced. In some buildings, upgrading selected components may improve performance while allowing suitable parts of the existing installation to remain.
Modernisation may involve upgrading controls, motors, door operators, fixtures, or other components, depending on the lift’s design and condition.
Full replacement may be more appropriate when major components have deteriorated, essential parts are difficult to source, or the existing system cannot reasonably meet the building’s requirements through upgrades.
| Consideration | Lift modernisation | Full lift replacement |
| Existing equipment | Retains suitable parts of the installation | Replaces the existing lift system |
| Scope of work | Upgrades selected components | Involves a more extensive installation project |
| Parts availability | Suitable existing components and upgrade options must be available | Reduces reliance on obsolete components from the old system |
| Building requirements | Existing configuration remains suitable | Allows the lift system to be planned around current requirements |
| Project planning | Depends on the components being upgraded | Requires planning for removal, installation, and commissioning |
A technical assessment helps determine which option suits the building rather than relying on the elevator’s age alone.
3. Plan for Resident Access During the Replacement
Resident access is one of the most important considerations in a strata lift replacement project. If an apartment building has only one elevator, taking it out of service can create significant difficulties.
Before work begins, strata managers should establish how residents will access their apartments during the project.
Consider the needs of:
- Older residents who may struggle with stairs.
- Residents with disabilities or limited mobility.
- People recovering from surgery or illness.
- Families with prams and young children.
- Residents who regularly use mobility equipment.
- Care workers and other essential visitors.
Where possible, communicate the expected downtime well in advance. If the building has more than one lift, the contractor may be able to plan the work in stages to maintain some elevator access. However, this depends on the building layout and project scope.
For buildings with a single lift, strata managers should discuss practical access arrangements with the contractor and affected residents before approving the schedule.
4. Establish a Realistic Budget
Lift replacement involves more than the cost of the new elevator equipment. Strata managers should understand the full project cost before presenting the proposal to the owners corporation.
The budget may include:
- Removal and disposal of existing equipment.
- New elevator equipment and components.
- Installation labour.
- Electrical and building-related work.
- Modifications to the lift shaft or associated areas, if required.
- Testing, commissioning, and handover.
- Temporary access arrangements, where applicable.
- Project management and other professional fees.
It is also sensible to discuss potential variations. Older buildings may have concealed conditions that become apparent only after work begins.
Strata managers should request a detailed quotation that explains the project scope, inclusions, exclusions, payment stages, and circumstances that could result in additional costs.
5. Review the Building’s Current and Future Requirements
An elevator that was suitable when an apartment building first opened may no longer meet its current usage requirements.
Before choosing a replacement, consider how the building is used today and whether those needs may change.
Important factors include:
Passenger capacity: Consider the number of apartments, residents, visitors, and expected peak-period demand.
Lift dimensions: Check whether the proposed lift can accommodate mobility equipment, prams, and other common requirements.
Door operation: Door opening width and operating time can affect accessibility and passenger movement.
Travel speed: The appropriate speed depends on the building’s height, number of floors, and expected usage.
Energy efficiency: Compare available equipment options and their expected operating requirements.
Accessibility: Consider the needs of residents with disabilities and whether the proposed design supports practical access.
The replacement should be selected according to the building’s actual requirements, not simply by choosing a lift with specifications similar to the old one.
6. Understand the Lift Replacement Timeline
A lift replacement project involves several stages. Strata managers should understand the expected timeline and how each stage may affect residents.
| Project stage | Typical activities |
| Initial assessment | Inspecting the existing lift and identifying project requirements |
| Scope and quotation | Confirming specifications, costs, inclusions, and exclusions |
| Approval and planning | Obtaining the necessary owners corporation approvals and coordinating the project |
| Preparation | Ordering equipment, arranging site access, and preparing work areas |
| Removal | Taking the existing elevator equipment out of service and removing it |
| Installation | Installing the replacement equipment and associated components |
| Testing and commissioning | Checking operation and completing required testing |
| Handover | Providing relevant documentation and explaining maintenance requirements |
The actual duration varies according to the building, lift design, equipment availability, and extent of the work. Strata managers should ask contractors to identify key milestones and explain which factors could delay completion.
7. Check Contractor Experience and Project Support
Choosing a lift replacement contractor involves more than comparing quotations. Strata managers should understand who will manage the work, coordinate site activities, and communicate project updates.
Before appointing a contractor, ask:
- What experience do you have with apartment and strata buildings?
- Who will be the main project contact?
- How will residents be informed about planned work?
- What is included in the quotation?
- How will unexpected site conditions be handled?
- What testing and commissioning will be completed?
- What documentation will be provided at handover?
- What maintenance support is available after installation?
Clear answers help the owners corporation understand what to expect throughout the project.
8. Prepare a Resident Communication Plan
Residents should not have to rely on informal updates to understand when their lift will be unavailable or when access is expected to resume.
A communication plan should explain:
- Why the lift is being replaced.
- When work is scheduled to begin.
- The expected period of downtime.
- Which areas may be affected by construction activity.
- How residents can access the building during the work.
- Who to contact with questions or accessibility concerns.
- How changes to the schedule will be communicated.
Provide written notices before work begins and share updates when important milestones are reached. If the schedule changes, communicate the revised information promptly.
9. Consider Maintenance After Installation
A replacement lift still needs regular inspection and maintenance. Strata managers should understand the ongoing service requirements before selecting a system.
Ask the contractor about recommended maintenance intervals, service arrangements, expected consumables, and how faults will be reported and addressed.
A clear maintenance plan helps the owners corporation understand its ongoing responsibilities and budget for the elevator’s continued operation.
You can also review lift maintenance services to understand the importance of ongoing support after installation.
How Skyrise Elevators Can Help With Strata Lift Projects
Skyrise Elevators works with building owners and managers on elevator-related requirements, including lift installation, modernisation, replacement planning, and maintenance.
For strata managers considering a replacement, discussing the existing lift’s condition, building layout, resident requirements, and project expectations with an experienced contractor can help clarify the available options.
Visit Skyrise Elevators to learn more about its elevator services and discuss the requirements of an apartment building project.
Final Thoughts
Replacing an apartment building lift requires more than selecting new equipment. Strata managers must consider the existing system’s condition, the needs of residents, project costs, contractor experience, installation timelines, and ongoing maintenance.
Early planning helps the owners corporation understand the scope of work and prepare for temporary access restrictions. A professional assessment can also establish whether modernisation or full replacement is appropriate.
By addressing these considerations before work begins, strata managers can make informed decisions and coordinate a lift replacement project with clearer expectations for everyone involved.